激情综合色综合啪啪五月丁香搜索,日韩精品性生活免费视频,亚洲一本到无码av中文字幕,最近高清中文字幕视频在线

Chongqing Huaxi River Project
Project Time

2021-2022

Project Content

The land for the newly built water purification station at the end of the box culvert in Dashan Village is located in the current Dashan Village Park. The design scale for the rainy season is 14000 m3/d, and the design scale for the dry season is 3420 m3/d, with Kz=1.80. The design volume of the storage tank is 14000 m3. After the completion of the project, the effluent quality of the water purification station meets the standard of Class IV. The treated effluent is still discharged through the outfalls, and the final receiving water body is the Huaxi River.

Technical Proposal

The gate type automatic flushing system is adopted. In the absence of anyone on duty, the gate type automatic flushing system can achieve remote monitoring, information integration, automatic flushing, autonomous circulation work, etc. It can effectively flush sediment from the floor of the storage tank into the collection corridor, achieving the effect of cleaning the storage tank.

11花溪河.jpg